Eliminate your Stage Gates in favor of Events

I have been struggling on how, or even if I should use Stage Gates or Control Points in the Lean Service Design methodology. In a recent interview with Ron Mascitelli, president of Technology Perspectives and author of five books, his most-recent publication,Mastering Lean Product Development: A Practical, Event-Driven Process for Maximizing Speed, Profits, and Quality, Read More …

Accentuate the Positive Eliminate the

“Man, they said we better Accentuate the positive Eliminate the negative Latch on to the affirmative Don’t mess with Mister In-Between No, do not mess with Mister In-Between Do you hear me, hmm?” The music was written by Harold Arlen and the lyrics by Johnny Mercer, and it was published in 1944. You wonder why Read More …